File Tutorial Surpac
1. Pembuatan string dan section
2. Geologi database and drillhole
3. Contour quality
4. Block Modelling
5. Mineplan
6. Perhitungan volume
7. Mine Design and Surveying
8. Pembuatan kontur
9. Pit design
10. Estimasi SR
11. Perhitungan volume dengan surpac
12. Pembuatan segment, section dan boundary
13. Database Surpac
14. Pendahuluan Surpac
15. Pengenalan Perintah Editing Surpac
16. Load Data Exell Surpac
17. Load Data Dari DTM 350 Surpac
18. Print Peta Surpac
19. Digitizer Peta Topografi Surpac
20. Pit Design Surpac
21. Membuat Isopac Contur Surpac
22. Dasar Perhitungan SR Surpac
23. Tips Trik Surpac
24. Pembuatan peta progress tambang
25. Pembuatan peta tambang di surpac
26. Export file STR ke DXF
27. Tutorial basic surpac
29. Membuat boundary dengan cara digitasi
30. Underground design
31. Contouring
32. Open Pit Blast Design
33. Open Pit Design
34. Solid Model
35. Strings & DTM’s
36. Training Surpac
37. Underground Blasting
38. Waste Dump Design
39. Creating a Map of a Pit Design
40. Pit Design Data Preparation
41. Pit Design to Surface Model
42. Pit Design to Surface
43. Pit Design
44. Restarting a pit design
45. Visualisation
46. Polygonal Resource Estimation
47. Table Creation and Loading Data
48. Database Structure
49. Extracting and Processing Data
50. Cara membuat bench
51. Pembuatan Block Model Tiga Dimensi
51. Tutorial Membuat Section Block Model Per Level
52. Tutorial Report Cadangan Dan Tonase OB
53. Tutorial Plotting
54. Extract Data Floor Kemudian Di Potong
dan masih banyak lagi file lainnya.

File Video Tutorial Gemcom Surpac
- Road Design Surpac
- Pengolahan Kontur Topografi
- Pembuatan Peta Progress EOM Part I
- Pembuatan Peta Progress EOM Part II
- Import Point With Annotation
- Basic Surpac
- Block_Model_DMH
- Database_DrillHole_Part 1
- Database_DrillHole_Part 2
- Database_DrillHole_Part 3
- Design Pit Coal
- Dump Design
- Dump Design Volume
- Evaluasi Cadangan Bauksit Al
- Membuat Drill Holes dengan Surpac
- Membuat Peta Kontur Dengan Surpac part 1
- Membuat Peta Kontur Dengan Surpac Part 2
- Membuat Pit Bottom
- Menghitung Volume Cut and Fill
- Menghitung Volume Reserve
- Pengantar Dump Design
- Pengenalan Surpac
- Perhitungan Block_Modelling
- Perhitungan Sumberdaya Batubara (Metode Circular)
- Pit Design
- Pit Intersection
- Road Design Surpac 01
- Road Design Surpac 02
- Road Design Surpac 03
- Pembuatan Pit dengan Surpac
- Surpac_Training_Geologycal Database
File Tutorial Gemcom Minex
1. Membuat Project Baru di Minex
2. Database & Schedule
3. Grid dari Minescape
4. Import Grid Minescape
5. Pembuatan graphic dan geometri database
6. Copy project
7. Pembuatan grid dan kontur
8. Perhitungan volume
9. Import mincom grid or schema minescape
10. Pembuatan section
11. Seam model
12. Pembuatan bench
13. Pit Design
14. Reserves database
15. Quality
16. Minex schedule database
17. Equipment productivity
18. Pembuatan sequences
19. Pembuatan seam cross section
20. Equipment move
21. Pembuatan grid and triangle
22. Seam modelling
23. Polygon/Boundary, point
24. Quality, Schedule and Equipment Productivity
25. Seam modelling
26. Membuat Plan di Minex
27. Memasukkan Databor kedalam Gemcom Minex
28. Pit Opt
29. Pit Design
30. MODUL MINEX – DASAR, GEOLOGI, PIT
Tutorial Training Minex PDF, Doc, XLS Dan Video (1.48 GB)
Tutorial Training Minex :
Pit Optimation
Reserving
Join
Schedulling
Minex BHDB & Seam Modelling
Project Setup
Membuat Project
Mengganti Satuan
Load Data
Import Data DXF/DWG
Import Data XYZ
Display
Membuat dan Mengganti Local Origin
Create String
Memotong Area (Clipword)
Load Data
Load Data Borehole
Collar Data
Load Collar Data
Validasi Data Collar
Display Data Collar
Header Data
Load Header Data
Filter/Select Borehole
Reporting Select Borehole
Litho
Load Data Litho
Validasi Data Litho
Report Sample Data Litho
Display Data Litho
Geophysical
Create New Variabel
Load Las Data
Display Geophy Profile
Quality
Create New Variabel
Load Quality Data
Validate Qual Data
Display Qual Data
Seam Picks
Load Seam Layer Interval
Validasi Seam Picks
Report Borehole Interval
Report Seam Data
Report Uncorelated Lithology
Report Seam Quality Validation
Statistic Analysis
Bow
Create Weather
Load Weathered
Membuat Format Default Minex
Create Surface and Grid
Create Grid Topo
Display Grid
Create Grid Weathered from W of Drillhole Data
Create Grid Weathered Bow DH
Create Bow Manipulate
Display Bow Grid
Interpolation dan Corellation
Membuat Plan
Mount Seam Corellation Plan
Borehole Display
Create Section
Mount Section Create
Section Grid
Check Corellation
Add/Edit Seam Interval
Bore Seam Modelling
Seam Model
Cek Perbedaan Elevasi Collar vs Topo
Seam Data Report
Validate Splitting
Report Splitting
Bore Seam Modelling Splitting
Bore Seam Modelling Father/Son
Report Father/Son
Report Seam Validation
Export Seam Layer Interval
Bore Seam Modelling Set Missing Seams
Report Set Missing Seam
Borehole Seam Modelling
Create Structural Model
Create Structur Grid
Seam Floor dan Seam Thickness
Washout
Seam Cross Section
Borehole Section
Create Grid Seam Washout
Final Model
Quality Model
Display Grid Quality
Resources Reporting
Insitu Resources
Detail Resources Reporting
Create New Project
Set Project Directory
Create GM3 (String) : Convert Data DXF, ASCII, XYZ
Create B31 : Database Boreholes (Collar, litho, LAS)
Cerate parameter MPF
Import String File
Merubah Garis Menjadi Titik
Editing Line
Import Data Survey (XYZ From TS)
Membuat Triangle
Membuat Polygon
Membuat Grid
Membuat Contour
Copy Geometri File
Memotong File Topo
Menggabungkan Topo Awal dan Topo Progress
Membuat Triangle
Menghitung Volume Triangle
Membuat Area Plot
Membuat Section
Membuat Grid File
Create Line
Geomodel
Database Provide
Add Data Type
Membuat Sub Data Type
Load Collar
Validasi (Sebelum Running Model)
Collar Validation
Reporting Validation
Seam Validation
Seam Model Buat Reporting
Bore Seam Modelling
Fatherson
Set Missing Seams
Seam Model
Buat Folder Grid Uncut
Membuat Grid Seam
Buat Grid Seam Roof
Interburden
Cut Model
Membuat Grid Quality
Menghitung Volume
MINEX BHDB & SEAM MODELING
1. Project Setup
2. Load Data
A. Surface & Map
B. Borehole
– Collar
– Header
– Litho
– Geophy
3. Create Surface Grids
4. Interpretation & Correlation
– Profile
– Section
– Plan
5. Bore Seam Modeling
A. Update Picks
B. Spilting/Merging
C. Father & Son
D. Set Missing Seam
E. Missing Seam Interpolation
F. Set Thicknes To Zero
6. Create Sturctural Model
7. Washout
8. Create Final Model
9. Create Quality Model
10. Resorces Reporting
Pit Optimizer
Optimation
Reservig
Join
Schedulling
Top Coal
Merge Cut Model
Pit Optimition
Design Pit
Reserves
Strip & Block
Schedulling
File Video Tutorial Minex
- Load LAS File
- Capture Graphics
- Cara Buat Fault 2D
- Cara Load Data Lithology
- Cara Membuat Control Bore Hole
- Cara Setting Seam Sequence dan Load Seampick
- Edit Polygon Resource
DISKON 30% menjadi 155 RIBU
(Seratus Lima Puluh Lima Ribu Rupiah)