File Modul Tutorial Training Minescape Xpac Minex dan Surpac Versi Premium terdiri dari cara pengoperasian dan manual handbook disertai kasus dan contoh serta video training juga, Berikut garis besar isi filenya :
File Tutorial Minescape
1. Pembuatan Schema
2. Geological Resource
3. Open Cut Planning
4. Reserve
5. Insert Coloums
6. Ramp Design
7. Konsep Mine Plan
8. Stratmodel
9. Quality
10. Pembuatan grid topografi
11. Load import drill hole
12. Generate model 2D 3D
13. Pembuatan skala
14. Posting dan pencarian seam
15. Membuat DH prediksi
16. Minescape explorer
17. Haulage road
18. Proses data survey di minescape
19. Coal progress by unix minescape
20. Membuat kontur struktur dari stratmodel
21. Membuat kontur topografi
22. Membuat resgraph
23. Membuat surface
24. Membuat table file
25. Setting unit di minescape
26. Setting printer di minescape
27. Membuat table file
28. Memotong design pit dengan topo
29. Import data excel ke minescape
30. Mine scheduling
31. Prosedure pengoperasian minescape
32. Block model
33. Drill and Blast
34. System admin
35. Quality Model (Membuat Definisi Quality, Membuat Key Quality Membuat Model Quality, Membuat Quality Default, Mengimport Data Quality, Composite, Membuat Kontur Quality, Posting & Pencarian Seam kualitas, Membuat Section 2d kualitas)
36. Fault (Membuat skema baru, Mendefinisi Fault)
37. Cara Membuat Pit Optimizing di Minescape
38. Konsep Mine Schedule (Mine Schedulling, Short Term Planning, Long term Planning)
39. Membuat Sequence PIT Dengan Minescape
40. Minescape Pit Limit Dan-Reserve Calculation
dan masih banyak lagi file lainnya.

File Tutorial Minescape versi 5.7
Tutorial Minescape V5.7 – Open Cut (PDF)
Materi Open Cut terdiri dari :
1st Day
- Membuat general boundary
- Membuat batter blocks
- Memotong batter blocks
- Menggabungkan batter blocks
- Membuat Solid blocks
- Membuat section solid blocks
2nd Day
- Membuat bench definition
- Menghitung reserve solid blocks
- Editing excel & Membuat resgraphics
- Membuat pit & Ramp
- Memotong pit terhadap topography
3rd Day
- Menghitung reserve pit
- Membuat design disposal
- Menghitung volume disposal
4th Day
- Membuat short term plan, disposal dan ramp
Tutorial Minescape V5.7 – Stratmodel Day 1 (PDF)
Materi Stratmodel Day 1 terdiri dari :
- Konsep Dasar Stratmodel
- Tahapan Pembuatan Model
- Validasi Data
- Topo Model
- Schema
- Stratmodel Schema
- TAB MODEL
- Model Options
- Display all compound
- TAB DEFAULTS
- TAB LITHOLOGY
- TAB ELEMENTS
- TAB COMPOUND
- TAB SURVEY
- TAB CONFORMABLE
- TAB FAULTS
- Drill Hole
- Import/Load Drill Hole
- Check Drill Holes
- Statistic Drill Holes
- Posting Drill Holes
- Contour Drill Holes
- Section Drill Holes
- Drill Connect
- Load Driil Holes
- Statistic Dholes
- Posting Dholes
Tutorial Minescape V5.7 – Stratmodel Day 2 (PDF)
- Patahan (Fault)
- Membuat atau Edit Patahan
- Load/Import Patahan
- Edit Patahan
- Pembuatan Model
- Model Tabel
- Penetration Files
- Model Grid
- Pemeriksaan Model
- Statistic Model
- Report Model
- Verify Model
- Predict Model
- Predict Multi
- Output Graphics
- Mesh Model
- Post Model
- Contour Model
- Contour Multi – Model
- Section Model
Tutorial Minescape V5.7 – Stratmodel Day 3 (PDF)
- Quality Definition
- Key Quality
- Model Quality
- Mengatur Model Quality
- Default Quality
- Import Data Quality
- Import Quality
- Composite Quality
- Output Graphics Quality
- Output Quality – Contour
- Output Quality – Post
- Output Quality – Section
- Geological Resources
- Tahap-Tahap Perhitungan Resources
- Overburden Definition
Video Tutorial Minescape V5.7
- Video Tutorial Minescape V5.7 Open Cut – Create Pit Limit
- Video Tutorial Minescape V5.7 Schedule- Progress plan surfaces, Generating Sections
- Video Tutorial Minescape V5.7 Schedule- Progress plan surfaces, Prerequisites
File Video Tutorial Minescape Mincom
- Coal Model – Setup Topo Model
- Basic Minescape
- Batter Block 1
- Batter Block 2
- Batter Block 3
- Batter Block 4
- Batter Block 5
- Create Projects
- Expresi Total Roof dan Total Floor
- Import Data
- Membuat Basegrid
- Membuat Contur Topo
- Membuat Cross Section
- Membuat Garis
- Membuat Kontur
- Membuat Ramp Manual Pada Sequend
- Membuat Surface Topo
- Membuat Triangle
- Menentukan Interburden Ratio dengan MXL Expression
- Menghitung Volume
- MineScape Schedule Progress Plan Surfaces
- Tutorial Training Minescape 5.7 – Open Cut 1 Create Pit Limit
- Tutorial Training Minescape 5.7 – Open Cut 2 Create Batter Block
- Tutorial Training Minescape 5.7 – Open Cut 3 Create Solid
- Tutorial Training Minescape 5.7 – Open Cut 4 Hitung Reserves
- Tutorial Training Minescape 5.7 – Open Cut 5 Mining Reserves
- Tutorial Training Minescape 5.7 – Open Cut 6 Resgraphics
- Tutorial Training Minescape 5.7 – Open Cut 7 Strip Design
- Tutorial Training Minescape 5.7 – Open Cut 8 Reserve Strip
- Pengaturan Mouse
- Perencanaan Tambang (Pembuatan Peta Digital)
- Plotting Hasil Design Tambang atau Monthly Plan Map
- Posting Data
- Reformat Tabel
- Section 3D
- Setting MKStoolkit Untuk Program Minescape
- Tutorial Training Minescape 5.7 – Stratmodel 1 Import Topography Data
- Tutorial Training Minescape 5.7 – Stratmodel 2 – Create Schema and Import drillhole
- Tutorial Training Minescape 5.7 – Stratmodel 3 – Drill Hole Interogate
- Tutorial Training Minescape 5.7 – Stratmodel 4 – Create Line Section, Subcrob, Contour Structur and Contour SR
- Tutorial Training Minescape 5.7 – Stratmodel 5 – Quality Model
- Tutorial Training Minescape 5.7 – Stratmodel 6 – Perhitungan Sumberdaya Batubara
- Stratmodel Part 1
- Stratmodel Part 2
- Stratmodel Part 3
- Stratmodel Part 4
- Stratmodel Part 5
- Stratmodel Part 6
- Setting Process Windows di Minescape
- Stratmodel
- Triangle Volume
- Cara Edit Point Project
- Cara Edit Posisi Projects
- Cara Export File DXF
- Cara Menampilkan Toolbar
- Cara Pembuatan Modeling
- Cara Restore Schema
- Cara Solid_Open Cut Coal
- Contoh Trenching Pit 19
- Pembuatan Contour Quality
- Perhitungan Cadangan
- Perhitungan Volume Tambang
- Perhitungan Volume Triangle
- Resgrap Open Cut Coal
- Resgraphics
- Setting Back_White
- Setting Change_High Wall_Low Wall
- Setting Mouse_Set
DISKON 30% menjadi 155 RIBU
(Seratus Lima Puluh Lima Ribu Rupiah)